In April 2024, the last 8 buildings of the ATAL – Nowe Miasto Polesie Stage 3 project in Lodz received a use permit. Thus, the entire investment, i.e. 14 residential buildings with services, designed by Horizone Studio for ATAL has been completed.
The project consists of two stages: stage 3a – 6 buildings and stage 3b – 8 buildings. The developer has assumed a diversified structure of apartments, from one-room studios to over 100-meter, spacious five-room apartments for families.
The realization of the ATAL New City Polesie Estate Stage 3, was appreciated and shown by the national magazine Architektura i Biznes as an example of modern residential architecture. The investment was devoted to an extensive publication dedicating the cover of the March issue to the project.
⇒ View article
After more than 1.5 years of design work and obtaining three building permit decisions, the ATAL New City Polesie Stage 3 development in Lodz began in 2020. The urban planning concept for the development, located at the corner of Pienista and Maczka Streets, assumed the creation of a residential complex in the form of four quarters of development, interconnected by an attractive urban space.
The design of the New Town Polesie estate realizes the concept of synergy of architecture and functionality, while at the same time blending harmoniously with the surrounding landscape and taking full advantage of the location’s potential. The open, unfenced and well-thought-out architectural layout of the estate integrates the residents on the one hand, and creates a sense of privacy and comfort on the other. The backbone of the establishment is a pedestrian and bicycle route connecting the area of the estate’s entrance with a green recreational area in the depth of the establishment.
Basic parameters of the investment:
PUM + PUU area: approx. 23,000 m2
Total area: approx. 47,500 sqm (above and underground part)
Number of apartments: 344 (including: 140 apartments in stage 3A + 204 apartments in stage 3B)
Number of commercial units: 40
Number of parking spaces: 532 (4 garages, stage 3A and 3B)
Design: 2019-2021
Implementation: 2021-2024
⇒ more about the project